The Palmdale Transportation Center Transit & Infrastructure Design Project will refine and expand on the initial infrastructure analysis as identified by the California High Speed Rail Authority (HSRA). It will include an analysis of the existing and future planned infrastructure systems necessary to support the future multi modal high-speed rail, Metrolink and BrightlineRailUSA Station, and may be used by the California High-Speed Rail Authority to support the development of future design documents.
The project is located on the west side of 6th Street East between Avenue Q and Palmdale Boulevard in the City of Palmdale.
The project limits are defined by the City of Palmdale Transit Area Specific Plan, which is bound by Rancho Vista Boulevard to the north, Avenue R to the south, SR-14 to the west, and 15th Street to the east, and also includes the Anaverde watershed that is tributary to the Avenue R regional detention basin.
The Palmdale Transportation Center Transit & Infrastructure Design Project is being funded through the Los Angeles Metro's Measure M program in the amount of $2,000,000.
MILESTONES | BEGIN | END | DURATION (MONTHS) |
---|---|---|---|
Analyze environmental impacts of future station | March/April 2021 | September 2021 | 6 |
Avenue R Regional Detention Basin EIR | May 2021 | November 2022 | 18 |
Avenue R Regional Detention Basin Design | November 2022 | November 2023 | 12 |
Infrastructure Improvements – downstream/upstream | November 2022 | November 2023 | 12 |
Design of the LA County Sanitation Trunk sewer by-pass | December 2021 | December 2022 | 12 |
COP Public Sewer By-Pass, 6th Street East | December 2021 | December 2022 | 12 |
COP Regional Storm Drain Relocation, Sierra Hwy | November 2022 | November 2023 | 12 |
Avenue Q Utility Relocation | November 2022 | November 2023 | 12 |